Connect the site route to the building.
Define duct-bank spacer assemblies, conduit stub-up racks, outdoor conduit stands, and brackets at carrier entries. Include the support transitions where underground services rise toward electrical equipment or fiber pathways enter the building.
- Duct-bank spacers matched to the conduit array
- Conduit stub-up and equipment-entry racks
- Outdoor stands and route-transition supports
- Carrier-entry and meet-me-room pathway brackets
Coordinate civil and service requirements.
Provide the conduit schedule, array geometry, route elevations, and utility or carrier requirements. Spacer configuration and concrete placement details follow the approved duct-bank design. Exterior frames need the project’s environmental loads, corrosion requirements, foundations, and attachment details.
- Conduit diameters, row and column spacing, and bend locations
- Stub-up dimensions and equipment connection elevations
- Wind, seismic, exposure, and material requirements where applicable
- Specified separation and identification for redundant power and fiber routes
Release packages by site area.
Group the quantities by duct bank, yard segment, carrier route, and building entry. Include the civil and electrical drawing revisions, construction sequence, and penetration interfaces so the supports can be coordinated with foundations, concrete placement, waterproofing, and cable installation.